|
New corner rock crib and wire gate with woven wire on the bottom. |
|
Rock crib. |
It took all day but I got it done. This was the last fencing project from last year that I did not get to and was supposed to complete. So almost 8 months late, the last of the burned out fence posts was cut down and replaced with new fencing. I also installed a new gate and took out the three cow panels that were covering the opening. Those will be used to cross the creek on other sections of fencing. I am all about repurposing when it comes to fencing. The rocks take a long time to gather even with the tractor. The nice thing is you only have to load the bucket by hand and then load the rock crib by hand.
|
In progress rock crib. |
I had some rocks that were way too big for the rock crib so I dumped those in Donna's front yard for her dirt mound. She still needs a few more ton of rocks for decoration. As an aside, I managed to clean out the bottom land behind the shed of all rocks and impediments for the mower. I can freely mow and not hit hidden objects. This is a very nice side effect of collecting needed rocks.
No comments:
Post a Comment