Saturday, June 24, 2017

Tile work is done!

Well I did it I finished the floor in the library. I even managed to do it before AnnMarie got back from Berkeley. I stayed up till 0130 Thursday night working grout in and washing it off tiles. I ended up with a large blister in the palm of my right hand. I should of thought about rubber gloves but it took me almost five hours to complete. I don't think the gloves would have stood up and if they did my hands would have looked like raisins with multiple blisters from all the moisture trapped under the gloves. I showered before crawling into bed. I was supposed to be off all weekend but I messed up the work schedule and got called in to cover a shift the next morning. It was my own mistake. 
Unfortunately, the tile makes the room look like it needs something so we will now be picking out some new paint schemes for this room. I think I want to keep the ceiling the same and just paint the walls.  We will have to get sample cards and get this completed at the end of July so we can move the loom out of the living room. We have the book shelves stashed in the office upstairs. The goal will be to thin everything before it goes back in the room. 


Having to work on Friday threw off my alpaca shearing table build schedule. I went in today and had them cut another ten pieces of pipe and they recut my two 48 inch pieces into five threaded pieces plus cut another 5 threaded pieces for me. It is in the low 90s today and the pipe was in the bed of the pickup so it's really too hot to handle. This means first thing in the morning I need to get out there and finish putting it together. 
 
 

No comments:

Post a Comment